Load Test Lab test management
Give every performance test a clear team context.
Load Test Lab keeps the information around a performance test together: the project, members, labels, test definition, execution plan, criteria, results, and decision history.
By Load Test Lab product team Reviewed by Kedros, a.s. Updated Product version 1.0.0
Test detail
Test data⌃
Test parameters⌃
Test criteria⌄
Notification configuration⌄
Report configuration⌄
Preview of the current Load Test Lab interface. Example data only.
Organize work by project
Create projects, assign members, and use reusable labels to keep tests searchable and owned by the right people. Access is controlled through roles such as Customer Admin, Performance Tester, Manager, and Test Report Listener.
- Project membership
- Team roles and permissions
- Reusable labels
- Active and terminated records
Describe the test before it runs
Store the test name, type, application, version, environment, description, load, duration, ramp-up, peak, and acceptance criteria with the test itself. Load Test Lab supports load, stress, and endurance test types.
Keep execution and evidence connected
Attach a fixed or recurring test plan, import a completed result manually, or use the Agent for paid execution workflows. Evaluations, reference results, comparisons, notifications, and reports remain connected to the same test.
FAQ
Common questions
Can Load Test Lab use our existing scripts?
Yes. Existing .jmx scripts remain usable while Load Test Lab adds team context, scheduling, evaluation, comparison, and reporting around them.
Can different team members have different access?
Yes. Available screens and actions are controlled by the user role and project membership.
Put Load Test Lab into practice
Prove the value with a real test.
Start with the scripts and load generator your team already uses.